| Name of
Study |
Class
Environmental Assessment (EA) for Regional
Infrastructure (Water, Sewer, Transportation) |
| Brief
Description |
This
study is required to review alternative methods of
providing the required Regional transportation and
trunk water and sewerage infrastructure to service
Central Pickering, and potentially the Federal airport
land. The study will determine a preferred servicing
layout for Central Pickering, including property
ownership and easement requirements.
|
| Consultants |
To
be determined |
|
Status |
An
Evaluation Committee consisting of Regional staff has pre-qualified engineering
consultants to respond to a Request for Proposals
(RFP) for the Class EA. Terms of Reference and
funding arrangements between developers' group and
Region being
finalized. RFP anticipated to
be released late Summer 2008. |
| Other
Comments
|
Once
a consultant has been retained by the Region, the EA
is expected to take between 1 and 3 years to complete.
This Class EA will be coordinated with, and serve as
input to the ongoing Master Environmental Servicing
Plan (MESP), Natural Heritage System Management Study
and Neighbourhood Planning Study for Central
Pickering.
The Region of Durham is
the proponent for this Class EA.
The EA is being
front-funded 100% by the Seaton developers' group -
the North Pickering Community Management Inc.
|
| Information Available |
None to date |
| Contact
Information |
Donald
Yu - Region of Durham
Grant McGregor - City of Pickering
|
| Last Update
to this table |
July 10, 2008 |