Seaton Community
 
Name of Study Environmental Assessments - Various
Description The Central Pickering Development Plan identifies a number of facilities or road connections, or road crossings of creeks that will require review through the Municipal Class Environmental Assessment (EA) process.

As specific EA’s are commenced, they will be added to the study listing.

Consultants Not applicable
Status Two on-going studies have components that are being completed to meet certain requirements of the Environmental Assessment process: the Seaton Master Environmental Servicing Pan (MESP); and the Regional EA for Water, Sewer and Transportation.
Other Comments Both the MESP and the Regional EA are addressing the first two phases of the Class EA process. In general, Phase 1 is the identification of the problem or opportunity, and issues to be addressed. Phase 2 is the identification of alternative solutions to address the issues, and establishment of the preferred solution.

Examples of matters requiring further EA approvals for the development of Seaton include, but are not limited to:

  • The GO Station location;
  • The location and design of the extension of Whites Road over West Duffins Creek to connect to Sideline 26;
  • The appropriate location and structure for the Whitevale Road bypass over the west Duffins Creek;
  • Individual water reservoirs; pumping stations.
Information Available None to date
Contact Information Catherine Rose – City of Pickering
Last Update to this page July 10, 2008