| Name of
Study |
Seaton
Community Master
Environmental Servicing Plan |
| Brief
Description |
The
Master Environmental Servicing Plan (MESP) is expected
to address the following matters:
- Water source
protection;
- Water balance;
- Erosion sensitivity
of watercourses;
- Maintenance and
enhancement of aquatic habitat;
- Stormwater
management;
- Municipal service
requirements (water, sewers and stormwater);
- Transportation
system, including crossings of the natural
heritage system;· Non-municipal utilities (such
as hydro);
- Preliminary
servicing cost estimates;
- Major community
facilities and trails;
- An energy and water
management strategy; and
- An environmental
monitoring program.
|
| Consultants |
Sernas
Associates |
|
Status |
Most background
information completed. More deep wells are
required for the 3D groundwater modelling component.
Energy consultant has been retained.
A Phase I Background Report is anticipated in July 2008. |
| Other
Comments
|
The
MESP must be completed prior to, or concurrent with,
the first Neighbourhood Plan.
The study is being
undertaken by the Seaton developers' group -- the
North Pickering Community Management Inc.
The Region of Durham
will be conducting an Environmental Assessment for the
major trunk water and sewer infrastructure, as well as
major transportation infrastructure.
|
| Information Available |
-
Existing Conditions - Report
[PDF 108 mb]
This is an extremely large document - you may
experience difficulty downloading the report.
Appendices to the report are available for viewing
at the Planning & Development, City Hall, One The
Esplanade in Pickering.
-
Terms
of Reference [PDF 1.2mb]
|
| Contact
Information |
Reg Webster - Sernas Associates
Grant McGregor
- City of Pickering
|
| Last Update
to this table |
July 10, 2008 |